Check Ins

Roy Barnes
The valve for the hose bib was leaking. We tightened the packing nut an bled the system
Roy Barnes
Demo existing parts in upper toilet tank. Install new flapper and fill valve.
Roy Barnes
Demo existing power vent water heater and install new 50 gallon power vent natural gas water heater.
Hendrik van de Poll
Replaced water heater with a new gas 50 gallon.
Roy Barnes
Installation of new sewage pumps and wire panel. Old pump switch went bad.
Roy Barnes
Demo on kitchen sink water and drain lines for new kitchen cabinets and countertops.
Roy Barnes
Demo on kitchen sink water and drain lines for new kitchen cabinets and countertops.
Roy Barnes
Snaked the mainline and installed a new closet flange.
Roy Barnes
Demo and install 2 new customer provided toilets
Roy Barnes
Demo and install 2 new customer provided toilets
Brand Revu - Check-ins - Reviews - Content - Ranking